英语翻译本项目合同金额为190204608元,是“五纵、六横、七条线”高速公路网络中“纵三”的重要组成部分.本合同段全长12.1公里(起点桩号为K0+000,止点桩号K12+100).全线有桥7座,合计长1519m,其中大桥5座,分别是周家湾大桥(单幅140×2)m、榨河大桥(单幅420×2)m、唐家楼大桥(单幅240×2)m、王家湾大桥(单幅540×2)m、唐家磅大桥(单幅160×2)m,中桥两座,分别为河西垸中桥、西张店中桥,其中唐家楼大桥和王家湾大桥为30米预应力砼连续T梁,其余均为20米预应力砼空

2019-06-19

英语翻译
本项目合同金额为190204608元,是“五纵、六横、七条线”高速公路网络中“纵三”的重要组成部分.本合同段全长12.1公里(起点桩号为K0+000,止点桩号K12+100).全线有桥7座,合计长1519m,其中大桥5座,分别是周家湾大桥(单幅140×2)m、榨河大桥(单幅420×2)m、唐家楼大桥(单幅240×2)m、王家湾大桥(单幅540×2)m、唐家磅大桥(单幅160×2)m,中桥两座,分别为河西垸中桥、西张店中桥,其中唐家楼大桥和王家湾大桥为30米预应力砼连续T梁,其余均为20米预应力砼空心板;农机天桥5座;预制24m以上梁片312片.涵洞29座,通道15座,其中农机通道8座,人行通道2座,汽车通道5座;隧道两座,即周家湾隧道为连拱隧道,起点桩号K0+465,止点桩号K0+935,隧道净长470米;落依山隧道1座为分离式隧道,隧道净长1580米.
优质解答
This project contract for 190204608 yuan, is the amount of "five longitudinal, six horizontal, seven line" highway network "longitudinal and three" important component. This contract section full-length 12.1 km (starting point for pile K0 +.000, no BDC K12 + 100) pile number. A bridge across the seven 1519m, among them, aggregate long bridge, respectively is 5 tombs ZhouGuWan bridge (singles 140 x 2) m, squeezed river bridge (singles 420 x 2) m, TangGuLou bridge (240 x 2) singles WangGuWan bridge (m, singles 540 x 2) m, TangGu pounds bridge (singles 160 x 2) m, two medium-sized, respectively, western medium-sized ZhangDian hexi liuheyuan TangGuLou bridge, which medium-sized WangGuWan bridge for 30 meters with prestressed concrete continuous beam, others are T 20 meters prestressed concrete hollow slab; Farm machinery overpass 5 block; Prefabrication 24m 312 chips. Above beam tablet Culvert 29 seats, the channel 15 seats, including farm machinery channel 8 saddles, pedestrian channel 2 seat, car channel 5 block; Tunnel ZhouGuWan tunnel, namely two multi-arch tunnel, starting point, K0 + 465 pile number BDC K0 + 935 pile, tunnel, net long 470 meters; Fall in mountain tunnel 1 seat for separate tunnel, tunnel net long's 15 meters. This project contract for 190204608 yuan, is the amount of "five longitudinal, six horizontal, seven line" highway network "longitudinal and three" important component. This contract section full-length 12.1 km (starting point for pile K0 +.000, no BDC K12 + 100) pile number. A bridge across the seven 1519m, among them, aggregate long bridge, respectively is 5 tombs ZhouGuWan bridge (singles 140 x 2) m, squeezed river bridge (singles 420 x 2) m, TangGuLou bridge (240 x 2) singles WangGuWan bridge (m, singles 540 x 2) m, TangGu pounds bridge (singles 160 x 2) m, two medium-sized, respectively, western medium-sized ZhangDian hexi liuheyuan TangGuLou bridge, which medium-sized WangGuWan bridge for 30 meters with prestressed concrete continuous beam, others are T 20 meters prestressed concrete hollow slab; Farm machinery overpass 5 block; Prefabrication 24m 312 chips. Above beam tablet Culvert 29 seats, the channel 15 seats, including farm machinery channel 8 saddles, pedestrian channel 2 seat, car channel 5 block; Tunnel ZhouGuWan tunnel, namely two multi-arch tunnel, starting point, K0 + 465 pile number BDC K0 + 935 pile, tunnel, net long 470 meters; Fall in mountain tunnel 1 seat for separate tunnel, tunnel net long's 15 meters.
相关问答