When the Permit to Work is completed by the officer carrying out the work,it is to be submitted to the Chief Engineer for verification and signature and then to the Master for signature.No work is to commence until the permit is signed by all parties.
优质解答
当施工许可被工作人员批准下来之后,将其递交给总工程师来验证并签字;然后递交给主任(或上层负责管理人员)签字.在各方面都签字之前不许开工. 当施工许可被工作人员批准下来之后,将其递交给总工程师来验证并签字;然后递交给主任(或上层负责管理人员)签字.在各方面都签字之前不许开工.